top of page
BFAQ
HOW DOES THIS WORK?
All BFA furniture is made-to-order from certified sustainably grown or salvaged North American hardwoods.BFA® CLASSICThe original collection, nearly unchanged since 1985. Choose sizes, styles, finishes, and more.BFA® CREATEPerfect fits, conscious design, and lifelong results. Let us design around your home and lifestyle, or provide design reference(s).ORDERINGBook a design session here or submit an inquiry here. Orders are received on a first-come-first served basis. A 50% nonrefundable deposit is required to reserve a position in the queue.LEAD TIMEFinalize fabric or leather upholstery and finish details while you wait for the BFA® fabrication and finishing teams to bring your furniture to life. Case-by-case rush fees available. Full payment is due upon completion.DELIVERY + INSTALLATIONRegional delivery and/or installation is performed by BFA® staff. Nationwide white glove or crated LTL shipping available.
LEAD TIMES, FACTORS, RUSH FEES?
Q: TL/DR?A: Lead times vary, and all projects are subject to lead time regardless of size or complexity. Lead times start at 8+ weeks, and typical lead time is around 14 weeks. A 50% nonrefundable deposit is required to reserve a position in the queue. Payment in full does not ensure expedited lead time.Q: Can I schedule final installation or delivery at the beginning of my project?A: Yes, we can work backward from a prearranged installation or delivery deadline in many cases. Contact us directly to coordinate.Q: What are minimum lead times?A: BFA® is no surplus. Our studio in downtown Boulder displays a considered range of our finished work, which is itself sold only when we complete new designs for the studio. Lead times vary, depending on your project:BFA® TRADE Connect directly for the most up-to-date lead times to plan your projects.BFA® CLASSICMade-to-order work from the BFA® CLASSIC collection requires 10+ weeks from deposit to completion. Rush fees are available on quick-ship options. Get in touch for quick-ship details.BFA® CREATECustom projects require 12+ weeks, depending on the below factors. Rush fees are available on a case-by-case basis and start at 25%.Q: What affects lead times?A: Material and component availability, site visits and conditions, and design approvals:Material + Component AvailabilityLarge volume projects, focused searches, specialty figure (burl, birdseye, curly, quilted grain, etc.), and LiveEdge slab specimen projects may require materials that use more time and effort to procure. Custom upholstery, stone, lighting, glass, and electrical components are subject to availability and coordination.Site Visits + ConditionsProjects requiring site visits are subject to additional coordination, including with third-party and outside vendors. BFA is not responsible for lead time changes due to site conditions outside our control.Design ApprovalsAll BFA CREATE projects are subject to an approval process requiring a client signature on shop or technical drawings ahead of fabrication. Drawings include custom design dimensions, finish selections, and handle selections if applicable. One (1) revision to BFA CREATE project drawings is included, and additional revisions are $250 each.Q: What's the fine print on lead times?A: We use our experience to meet expected lead times as routinely as possible. Given our living raw material and bench-made construction, final lead times are subject to change.Lead times do not include delivery or installation. Regional deliveries performed by BFA® staff are generally scheduled within seven (7) days of project completion, and installations may be scheduled in advance.
WHY THE WAIT?
The BFA® process is rush-resistant, yet at any given time, we may have 80 orders on the books. Coordinating every project with care, precision and conscientiousness delivers the best results.Get connected for the most up-to-date lead times and calendar opportunities for your project.
bottom of page